Client:
Large Storm water Contractor working on pipework in the Festival Plaza basement, with the precinct under extensive redevelopment.

Requirement:
A temporary support needed to be installed so the wall that the pipes were currently supported from could be safely removed. The solution needed to be flexible and adaptable to the varying wall heights and angles.

Solution:
A custom trapeze support system with threaded rod, strut and pipe clamps connected to modular frame siFramo 80. Engineering support was included, providing the client with certainty.

Benefits:
The solution was designed and delivered within a short time-frame, utilising our “5 runs per day” delivery service. Access issues to the busy site were alleviated, as the lightweight system is easily handled and installed on-site, not requiring a crane to lift into position.